The Law and Standards We Work To
Oceyon’s operations begin with compliance and extend into environmental, social and governance practice.
Oceyon works only under lawful authorisation, and in open cooperation with the authorities responsible, at sea and on land.
Our Standards
Oceyon’s operational standards are grounded in applicable law and recognised professional practice, drawing where relevant on the archaeological documentation and conservation principles contained in the Annex to the 2001 UNESCO Convention on the Protection of the Underwater Cultural Heritage.
Authority
At sea, Oceyon conducts survey and recovery operations in accordance with the legal requirements applicable to the location and nature of each project. These may include authorisations from coastal states and compliance with maritime, environmental and cultural heritage laws. Oceyon also respects applicable ownership and sovereign rights, including any consent required in relation to sunken state vessels. On land, operations are undertaken with lawful access to the site and in accordance with applicable heritage, planning and other regulatory requirements.
Safety and Operations
Every vessel Oceyon charters for survey or recovery must comply with applicable maritime safety and environmental requirements, including flag-state regulations, relevant coastal and port-state requirements, and the provisions of SOLAS and MARPOL where applicable. Ashore, Oceyon secures lawful access and establishes appropriate site-safety arrangements in accordance with applicable law before work begins.
Environment
Oceyon’s work begins with research, combining information from its private maritime archive, other historical records and remote-sensing intelligence, including satellite imagery, to identify and assess potential sites both underwater and on land. This research helps narrow search areas before fieldwork begins, minimising unnecessary environmental disturbance and helping preserve the archaeological integrity of each site.
At sea, Oceyon applies appropriate measures to minimise risks to marine mammals from acoustic surveys, drawing on guidance from the UK’s Joint Nature Conservation Committee (JNCC) where relevant and complying with applicable local requirements.
Before physical intervention, potential environmental and operational risks, including pollutants, unexploded ordnance and protected habitats, are assessed as appropriate to the site and proposed activities. Environmental assessments are undertaken where required by the relevant authorities. Following terrestrial operations, disturbed sites are appropriately reinstated in accordance with applicable requirements and agreed arrangements.
Community
Where a site holds cultural, historical or spiritual significance for a community, including local or Indigenous communities, Oceyon seeks to engage with relevant representatives at an appropriate stage of project planning, whether at sea or ashore. Engagement may continue throughout the project where appropriate, with due regard to applicable consultation and consent requirements.
Archaeological Recording
Oceyon recognises the importance of archaeological recording in preserving the historical and scientific value of sites, both underwater and on land. Archaeological documentation is undertaken in accordance with applicable national requirements and recognised professional standards, drawing where appropriate on the documentation principles contained in the Annex to the 2001 UNESCO Convention. Archaeological work is directed by suitably qualified archaeologists, including underwater archaeologists for relevant maritime projects, in accordance with the nature of the activities and applicable legal requirements.
Conservation
Where recovery is planned, Oceyon assesses conservation requirements in advance and develops appropriate conservation arrangements, in consultation with relevant authorities where required. Conservation is undertaken by suitably qualified professionals in accordance with recognised standards and applicable legal requirements. Recovered objects are documented and accounted for throughout their handling, transport and storage, and until their lawful transfer or other disposition.
Nothing Begins Without an Agreement
The path from a first conversation to fieldwork is the same for every programme. Nothing is surveyed, and nothing is moved, before it is complete.
A first conversation
An enquiry or proposal, discussed in confidence with the authority responsible.
Research and legal review
Ownership, rights, jurisdiction and protected status established before anything is proposed.
A signed agreement
Title, apportionment and reporting duties set out in writing and signed.
Permits and consent
Survey and recovery permits from the competent authority; landowner consent on land.
Reporting throughout
Every find recorded and reported to the authority, during and after the programme.